Skip to main content
Come Fan with UsWednesday, June 24, 2026

2012 Olympic Venue Previews: London Aquatics Center

The 17,500-seat London Aquatics Center will host Swimming, Diving, Synchronized Swimming and Modern Pentathlon.

Jul 12, 2012; London, UNITED KINGDOM; Aerial view of the Olympic Stadium and the ArcelorMittal Orbit and the Aquatics Center and the Water Polo Arena in preparation for the 2012 London Olympics. Mandatory Credit: Kirby Lee/Image of Sport-US PRESSWIRE
Jul 12, 2012; London, UNITED KINGDOM; Aerial view of the Olympic Stadium and the ArcelorMittal Orbit and the Aquatics Center and the Water Polo Arena in preparation for the 2012 London Olympics. Mandatory Credit: Kirby Lee/Image of Sport-US PRESSWIRE
Jul 12, 2012; London, UNITED KINGDOM; Aerial view of the Olympic Stadium and the ArcelorMittal Orbit and the Aquatics Center and the Water Polo Arena in preparation for the 2012 London Olympics. Mandatory Credit: Kirby Lee/Image of Sport-US PRESSWIRE

Location: Olympic Park at Stratford in east London

Events: Swimming, Diving, Synchronized Swimming and the swimming portion of Modern Pentathlon

Construction: Started in 2008 and completed in July of 2011 at a cost of roughly $420 million.

Gallons of Water: 2.6 million

Another Olympiad, another focal point on the site of the swimming competition. Much like the Water Cube was a highlight of the 2008 Games, so too will be the London Aquatics Center. And much like Beijing, it will host some of the Summer Olympics’ marquee events, from Tom Daley’s dives to the Ryan Lochte-Michael Phelps duels in the pool.

The Aquatics Centre consists of three pools -- a 50-meter competition pool, a 25m diving pool, a 50m warm-up pool -- as well as a warm-up area for divers. The 17,500-seat arena (a number that will drop to 2,500 after the Olympics) was designed by Zaha Hadid, an internationally-renowned architect and winner of the Stirling Prize in 2010 and 2011.

20120306_ajw_ax6_333_extra_large_medium

Leo Mason-US PRESSWIRE

The most impressive accomplishment on the Aquatics Center is the roof, which resembles a wave and is over 500-feet long and as wide as 262 feet.

Its skeletal structure rests on just two concrete supports at the northern end of the building and a supporting ‘wall’ at its southern end. This steel framework was initially constructed on temporary supports, before the entire 3,000-tonne structure was lifted up 1.3m in a single movement and successfully placed back down on to its permanent concrete supports.

After the Games, the Aquatics Centre will be used as a facility for the local community, replacing the Crystal Palace National Sports Centre as the home of clubs and schools, as well as elite swimmers.

Check out the SB Nation Channel on YouTube

See More:

More in General

GeneralFromPosting and Toasting
An SB Nation New Yorker needs our helpAn SB Nation New Yorker needs our help
GeneralFromPosting and Toasting
General
Sabastian Sawe breaks 2-hour barrier, shatters marathon world recordSabastian Sawe breaks 2-hour barrier, shatters marathon world record
General

The mythical two-hour mark was broken at the London Marathon.

By Bernd Buchmasser
A Huge Dog
THE HISTORY OF CHARGING THE MOUND, EPISODE 1THE HISTORY OF CHARGING THE MOUND, EPISODE 1
Play
General
Super Bowl 60 coin toss resultsSuper Bowl 60 coin toss results
General

The Seahawks and Patriots will open the Super Bowl with the coin toss to determine who starts with the ball. We have the full coin toss results for Super Bowl 60.

By David Fucillo
General
Marc Marquez completes a comeback for the agesMarc Marquez completes a comeback for the ages
General

MotoGP’s Marc Marquez completed a comeback for the ages with his 2025 title

By Mark Schofield
General
How to make sure SBNation.com appears in your Google search resultsHow to make sure SBNation.com appears in your Google search results